Clear records
history record
cancel
Clear records
history record
As we all know, the design process of distribution lines involves many factors. In order to improve the rationality of distribution line design, each step should be implemented strictly in accordance with the design process. At the beginning of the overhead line design task, the exact location of the line should be clearly defined. According to the overhead line design plan, the specific content of the design plan should be clearly marked on the topographic map, and the distribution line technicians should conduct on-site surveys and pay attention to each important point to negotiate the distribution line diagram.
Environmental pollution
It is reported that when the transmission line is in the air for a long time, the transmission power will be greatly reduced due to the influence of the surrounding environment. However, in some polluted places, rainwater contains a lot of acid or alkali, and the metal materials of the overhead line are acidic or alkaline for a long time. The influence of the alkaline environment will cause serious corrosion to the metal materials in the transmission line. This will seriously affect the life of the transmission line design of the overhead line. Therefore, when designing the overhead line, the impact of environmental pollution on the transmission of electrical facilities should be considered. 2. Climate impact
Typhoons and tsunamis occur in all coastal cities of China throughout the year. When designing transmission lines in these areas, the general transmission line design is no longer applicable to these areas, so the overhead line design that customers prefer is very important. Considering the climate characteristics of the construction area, the design of the overhead line is suitable for the transmission line design in the area.
Generally speaking, when designing professional overhead lines, in addition to the consideration of factors, other factors should also be considered. For example, in the design of power lines, it is not possible to have a great impact on the surrounding buildings and things under construction, and the other is to determine the overhead line. Design animal and plant damage line. It is also necessary to consider whether the transmission corridor design of the overhead transmission line has a leap, whether there are important facilities (such as national facilities) and make careful comparisons.