With the continuous development of social economy, in the process of building power transmission lines in China, choosing a more scientific and reasonable route has a multiplier effect. By selecting an appropriate transmission path, the efficiency of overhead line design and the quality of design can be improved. In addition, the grid structure of the transmission line can be effectively optimized to meet the growing demand for power loads. So what are the factors that affect the design of overhead lines in the process of transmission line design?
1. Factors of environmental change
Due to the constant changes in the environment, there is no way to really understand more of the actual situation. There is no such good expression of the location of the transmission line design of the overhead line and the local terrain and land quality of the transmission line, which leads to a large gap between the determination of the structure. Plan and the actual construction plan required. In the theoretical selection process, the design of the overhead line requires a field survey on site to make the solution more reasonable. For the location of the tower required for the transmission line and the difficulty of the specific construction, some capital costs are required during the construction process. Operational safety issues should be considered important.
2. Construction and construction factors
In addition, after the construction of the transmission line with a specific overhead line design, important operation and maintenance work should be carried out. This requires arranging the intersection of the path and the turning point in the design process of the overhead line design, and measuring and comparing the details with each other. The comparison between moderately priced overhead lines is conducive to better operation and maintenance of the transmission line, which is convenient for people's daily life and production, ensuring long-term safe and stable operation, and providing services for people's daily life and production.
In short, the overhead line design should determine different path design schemes, consider the problems comprehensively, and then select a relatively complete overhead line design scheme for the path construction of the transmission line. On this basis, the requirements of policies and relevant departments for the selection of transmission lines can be strictly followed. Professional overhead line design can also protect the ecological environment around the path, improve the utilization efficiency of the path, and extend the service life of the entire transmission system. Provide better power services.